Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Nov 29, 2022     Final cowl inlet trim and attachment - (0.7 hour)       Category: Cowl
1. Fitted the cowl with the baffles in place. Marked the top cowl where it needed to be trimmed inside the inlets, in order to match the bottom inlets.
2. Removed the top cowl and cut the inlets sides at the marks.
3. Replaced the top cowl. Marked and drilled the final two attachment holes on the inboard sides of the inlets. These two, along with the two others previously drilled, will receive nutplates shortly.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.